EuroChem VolgaKaliy

We are developing the Gremyachinskoe potash deposit in the Volgograd region, Russia. Below ground, the two skip shafts have successfully been connected and the implementation of the cage shaft program continues.

The volume of ore mined at the site is sufficient for operations during the initial stage of production as set out in the Group’s plan.

Above ground the flotation plant is in ramp-up mode, with the first concentrate obtained in July 2018. The total hoisting capacity of the two skip shafts is 10 million metric tonnes (MMT) of ore per annum. Phase 1 annual design capacity is estimated at 2.0 MMT and projected to be reached by 2027. Annual ore mining capacity will be 7.3 MMT. In 2023 EuroChem VolgaKaliy almost doubled production (0.7 MMT of potash). In 2023, skip shaft No. 2 was commissioned and the fleet of harvesters was increased. A second process line was also commissioned at the plant, which increased ore processing capacity from 400 to 650 t/h

Average KCl content at VolgaKaliy
Annual ore hoisting capacity at VolgaKaliy
Mine workings at VolgaKaliy
Share this post

20 Years of Growth

About us

Corporate governance

Global operations

Projects

UAE Public Documents

Careers

Life at EuroChem

Special programs

Vacancies

Compliance commitment

Contact us

Cookie policy

Data protection

EuroChem monthly sales data

EuroChem stories

Global Head of PR Media

Home

I really wish the geopolitical pressures would start to ease

Legal and compliance

Media

Coverage

News

Social media

Our approach to safety

Our Responsibility

Communities

Health, Safety and Environment (HSE)

Sustainability

Plant data

Products

Agricultural products

Industrial products

Next-generation fertilizers

Sitemap

Terms of use